Active Projects
4
2 scheduled this week
Total Flights
23
↑ 3 this month
Clients
6
1 new onboarding
Files Delivered
41
GeoTIFF, PDF, DXF
Recent Projects
Flight Log
Flight 3 — Orthomosaic
Upload GeoTIFF to render map
Before:
After:
⬛
Flight 3 — Latest
⬛
Flight 1 — Baseline
⇔
Before
After
Project Files
Progress Report
Project Details
Initial File Upload
Drop files here or click to browse
GeoTIFF, PDF, DXF, KML, JPG — Max 500MB per file
RC
Riverview Commercial
4201 Commerce Park Dr, Richmond, VA
3Flights
Jun 1Last Flight
ActiveStatus
WeeklySchedule
Recent Flights
Flight 3 — June 1, 2026
Foundation complete. Steel framing begun on north wing. Significant progress since last visit.
Flight 2 — May 2, 2026
Site clearing complete. Foundation formwork in progress on all sections.
Flight 1 — April 3, 2026
Baseline survey. Pre-construction site documentation.
Flight 3 — Orthomosaic
Riverview Commercial · June 1, 2026
Flight Notes
Flight DateJune 1, 2026
ConditionsClear, 12mph wind, 74°F
Coverage Area4.2 acres
Ground Sample Distance1.8 cm/px
Positional Accuracy±1.2 cm (RTK)
Images Captured412
Site ObservationFoundation complete. Steel framing begun on north wing.
Before:
After:
🏗
Flight 3 — Steel Framing Begun
🌱
Flight 1 — Pre-Construction
⇔
Before
After
Drag the handle to compare flights
Flight 3 — June 1, 2026
Orthomosaic_F3.tif
3DModel_F3.obj
ProgressReport_F3.pdf
AccuracyReport_F3.pdf
Flight 2 — May 2, 2026
Orthomosaic_F2.tif
ProgressReport_F2.pdf
Flight 1 — April 3, 2026
Orthomosaic_F1_Baseline.tif
BaselineSurvey_F1.pdf
Site_F1.dxf
RIVERVIEW COMMERCIAL
Progress Report — June 1, 2026 · Prepared by Meridian Aerial
Project Summary
Site Address4201 Commerce Park Dr, Richmond, VA
Project TypeCommercial Construction
Total Flights3 (Baseline + 2 Progress)
Monitoring FrequencyMonthly
Next Scheduled FlightJuly 1, 2026
Current Status — Flight 3 (Jun 1, 2026)
ObservationFoundation complete. Steel framing begun on north wing.
Coverage4.2 acres captured at 1.8 cm/px GSD
Positional Accuracy±1.2 cm (RTK GPS)
DeliverablesGeoTIFF, 3D Mesh, PDF Report, Accuracy Report
Flight History
Apr 3, 2026Baseline survey — pre-construction documentation
May 2, 2026Site clearing complete, foundation formwork in progress
Jun 1, 2026Foundation complete, steel framing begun
Technical Specifications
EquipmentRTK-enabled UAV with 20MP sensor
Processing SoftwarePhotogrammetry pipeline (Pix4D compatible)
Coordinate SystemWGS 84 / UTM Zone 17N (EPSG:32617)
CertificationFAA Part 107 · Fully Insured